logo
pine

How to Apply for a Phoenix Short-Term Rental Permit

Follow the Phoenix short-term rental permit process, including prerequisites, required forms, neighbor notice, the $250 fee, renewal, and SHAPE PHX submission.

Allowed with permit Updated July 23, 2026

Phoenix STR Permit Overview

Every Phoenix property offered as a short-term rental must obtain a City of Phoenix STR permit. The application is property-specific and is submitted through SHAPE PHX.

A complete application depends on work outside the city portal, including the Arizona TPT license, Maricopa County rental registration, notarized forms, insurance evidence, and certified-mail notice.

Sources:[2][3][4]

Permit at a Glance

Application
One permit per dwelling unit
Initial fee
$250 non-refundable
City decision
Within 7 days after receiving the application
Permit term
One year from issuance
Submission portal
SHAPE PHX
Sources:[2][3][4]

Before You Apply

  • Arizona TPT license

    Required

    Confirm the license is active and the property location is correctly associated.

  • Maricopa County registration

    Required

    Confirm the parcel is registered as a residential rental.

  • Liability coverage

    Required

    Prepare evidence of at least $500,000 aggregate coverage or qualifying marketplace coverage.

  • ADU status

    Required

    Determine whether a newer ADU triggers owner-occupancy attestation and proof-of-address requirements.

Too many forms and requirements?

Let Pine organize your Phoenix permit checklist, from prerequisites through the final SHAPE PHX submission.

You’ll continue in Pine to review the checklist and add property details. Final government submissions remain under your control.

Review 1: Application Documents

  • Affidavit and Attestation

    Required

    Complete the current form, check each applicable acknowledgement, sign it, and have it notarized.

  • Safety Equipment Map

    Required

    Show the locations of smoke detectors, carbon monoxide detectors, fire extinguishers, and other required equipment.

  • Owner’s Designee Authorization

    Complete this form only when the owner appoints a designee responsible for city-code compliance.

  • Conditional proof of address

    Attach the applicable proof when the current ADU owner-occupancy requirement applies.

Sources:[5][6][7]

Review 2: Notification Compliance

  1. 1

    Identify recipients

    Find the required neighboring properties plus registered HOAs and neighborhood associations within the city-defined area.

  2. 2

    Send the Notice of Intent

    Use certified mail and keep the mailing receipts for delivered notices or delivery attempts.

  3. 3

    Keep a copy of the notice

    The proof package requires the notice content as well as the mailing evidence.

  4. 4

    Complete the attestation

    Sign and notarize the Attestation of Compliance before submitting the notification package.

Sources:[2][3][8]

Submit in SHAPE PHX

Create or use the appropriate SHAPE PHX account, enter the property and contact information, upload the required material, and pay the city fee. The City states that it must approve or deny the permit within seven days after receiving the application.

The screenshots below show the SHAPE PHX interface through a sample permit workflow. Select the short-term rental record or category linked by the City for the property; labels inside the portal can vary by application type.

  1. 1

    Open SHAPE PHX and sign in

    Open the City portal, continue to the sign-in screen, and use the account responsible for the property.

    City of Phoenix SHAPE PHX portal entry page with a login action
    Open the City portal and continue to the SHAPE PHX sign-in page.
    SHAPE PHX sign-in page with username, password, account creation, and password reset options
    Sign in with the property account or create an account before beginning the application.
  2. 2

    Start a new application and choose the City-linked record

    Start an application from the portal home and select the short-term rental record or category identified by the City.

    SHAPE PHX portal home showing the Apply action and application dashboard
    Start a new City application from the SHAPE PHX dashboard.
    SHAPE PHX sample permit-type selection screen
    Use the permit-type screen as a navigation example, then choose the City-linked short-term rental record for the property.
  3. 3

    Complete applicant, address, and property details

    Enter the responsible applicant, confirm the rental address, and complete the property details requested by the STR application.

    SHAPE PHX sample applicant information screen
    Enter the applicant information requested by the selected City record.
    SHAPE PHX sample address search and confirmation screen
    Search for and confirm the short-term rental property address.
    SHAPE PHX sample project details screen
    Complete the property and application details required by the selected City record.
  4. 4

    Review the required items

    Use the portal checklist to confirm which forms, attestations, notices, and evidence remain incomplete.

    SHAPE PHX sample required work-items and document checklist
    Review every required item before uploading the permit package.
  5. 5

    Upload the permit package

    Upload the completed, signed, and notarized records required for this property and application.

    SHAPE PHX sample document upload screen with file and description controls
    Upload each required record and label it clearly for City review.
  6. 6

    Review, acknowledge, and submit

    Check the application summary, complete the portal acknowledgements, and submit the final package.

    SHAPE PHX sample application review screen
    Review the application summary and correct incomplete information before submission.
    SHAPE PHX sample acknowledgement and certification screen
    Read and complete the acknowledgements required by the selected City record.
  7. 7

    Save the reference and track the application

    Retain the confirmation and reference number so the owner or designee can monitor City review.

    SHAPE PHX sample submission confirmation with an application reference number
    Save the submission confirmation and reference number with the property compliance records.

Final submission stays with the owner or authorized designee

Review names, addresses, permit details, signatures, and notarization before uploading the application package.

Sources:[4][2][3]

Renewal & Deadlines

The permit expires one year after issuance. The ordinance directs the owner or designee to submit a renewal application at least 15 working days before expiration and pay the renewal fee.

The Phoenix application page specifically reminds renewal applicants to check whether new HOAs or registered neighborhood associations must receive notice.

Sources:[3][2]

Final Permit Checklist

  • Affidavit and Attestation — Acknowledgement and Agreement (notarized)

    Required

    Current city acknowledgement and attestation form; signatures must be notarized.

  • Proof of address for a qualifying newer ADU, when applicable

    Required only when the newer-ADU owner-occupancy condition applies.

  • Description / Map of Safety Equipment

    Required

    Show where the required smoke, carbon-monoxide, fire-extinguisher, and other safety equipment is located.

  • Owner’s Designee Authorization, when applicable

    Identifies the authorized designee responsible for City Code compliance.

  • Attestation of Compliance with Notice of Intent (notarized)

    Required

    Notarized city form confirming completion of the notification requirement.

  • Certified-mail receipts and a copy of the Notice of Intent

    Required

    Keep the receipt for each recipient and the exact notice that was sent.

  • Proof of a valid Arizona TPT license

    Required

    Phoenix requires evidence of the Arizona TPT license in the permit application.

  • Evidence that the rental is registered with the Maricopa County Assessor

    Required

    Confirm the parcel is registered as a residential rental with the County Assessor.

  • Evidence of at least $500,000 in liability coverage or qualifying marketplace coverage

    Required

    Provide evidence of the required coverage or qualifying marketplace protection.

Sources

Use these links to review the underlying Arizona statute, Phoenix rules, application pages, and forms.

  1. 1
    A.R.S. § 9-500.39 — Vacation and short-term rental regulation

    Arizona State Legislature

    State-law limits on local STR regulation, permitted licensing requirements, neighbor notice, insurance, prohibited uses, and civil penalties.

  2. 2
    Short-Term Rental Registry

    City of Phoenix Planning and Development Department

    Current Phoenix permit overview, fees, application portal, required forms, neighbor and association notice, and enforcement information.

  3. 3
    Ordinance G-7156 — Chapter 10, Article XVI Short-Term Vacation Rental

    City of Phoenix City Council

    Adopted city legislation and attachment covering permit applications, renewals, emergency contacts, neighbor notice, and operating requirements.

  4. 4
    SHAPE PHX Customer Portal

    City of Phoenix

    Portal used to submit Phoenix short-term rental permit applications.

  5. 5
    Affidavit and Attestation — Acknowledgement of STR Permit Requirements

    City of Phoenix Planning and Development Department

    Current notarized acknowledgement, background attestation, insurance acknowledgement, and conditional ADU owner-occupancy requirement.

  6. 6
    Description / Map of Safety Equipment

    City of Phoenix Planning and Development Department

    Form for documenting smoke detector, carbon monoxide detector, fire extinguisher, and other safety-equipment locations.

  7. 7
    Owner’s Designee Authorization

    City of Phoenix Planning and Development Department

    Authorization identifying a designee responsible for complying with City Code requirements.

  8. 8
    Attestation of Compliance with Notice of Intent to Operate an STR

    City of Phoenix Planning and Development Department

    Notarized form documenting certified-mail notice, mailing receipts, and a copy of the notice of intent.

  9. 9
    Short-Term Lodging

    Arizona Department of Revenue

    TPT guidance for stays under 30 days, licensing, online lodging marketplaces, filing, and county rental registration.

  10. 10
    Rental Registration Frequently Asked Questions

    Maricopa County Assessor’s Office

    Guidance for registering a residential rental, checking registration status, and appointing a statutory agent when required.

Your Phoenix STR Action Plan

Use this checklist to organize the property record. The owner or authorized designee remains responsible for signatures, notarization, certified mail, fees, and final submission.

  • Create one record per property

    Keep the permit, TPT, county, insurance, forms, receipts, and renewal date together.

  • Mark document states

    Separate missing, drafted, signed, notarized, mailed, and uploaded material.

  • Stop before final submission

    Have the owner or authorized designee review and complete the government portal action.

Turn the permit forms into a working checklist

Start with the property address and Pine will organize the prerequisites, forms, signatures, notarization, mailing, and upload steps.

You’ll continue in Pine to review the checklist and add property details. Final government submissions remain under your control.

Sources:[2][3]

Frequently Asked Questions

Where do I apply for a Phoenix STR permit?

The City directs applicants to submit through the SHAPE PHX Customer Portal.

Sources:[2][4]
What does the Phoenix STR permit cost?

The City lists a $250 non-refundable initial fee and the ordinance authorizes the renewal fee.

Sources:[2][3]
How long does Phoenix take to decide an STR permit application?

The City states that it must approve or deny the permit within seven days after receiving the application.

Sources:[2][3]
Is the neighbor notice part of the permit process?

Yes. The city page lists the Attestation of Compliance with Notice of Intent as the second review package.

Sources:[2][8]

This page is general information, not legal or tax advice. Regulations and agency procedures can change. Confirm the current requirement with the linked government office before operating or submitting an application.