Confirm the Property
Verify the address, jurisdiction, property type, eligibility rules, and private restrictions.
Before you list
Prepare the San Antonio STR Permit: prerequisites, documents, fees, application steps, verification, and post-approval work.
Approval path
Verify the address, jurisdiction, property type, eligibility rules, and private restrictions.
Bring the host, ownership, residence, tax, insurance, and supporting records into one file.
Work through the government sequence, then retain the submitted record and confirmation.
Confirm the issued approval, publish required details, and track taxes, changes, and renewal.
The goal is an active San Antonio Short Term Rental Permit tied to the correct property, operator, tax accounts, and listing information.
Allowed with a City STR permit and active hotel occupancy tax reporting. Type 1 is owner- or operator-occupied; Type 2 is not owner- or operator-occupied.
Obtain the permit before operating; respond to the City renewal reminder before expiration.
Match the street address to San Antonio authority and confirm the property class can use San Antonio Short Term Rental Permit. If either the boundary or eligible-use result differs, stop before opening the application.
Owner, applicant, and 24/7 designated-operator contact information.
Save the records that prove this classification; if the operator or dwelling cannot meet it, choose a lawful rental path before paying a fee.
Complete the process through the official San Antonio STR Permit Portal.
Prepare owner, applicant, and 24-hour operator contacts plus floor, parking, ownership, and authorization records. $300 for Type 1 and $450 for Type 2 applications and renewals.
Sign in to BuildSA, start a new application, and choose the Short Term Rental record type.
Identify the property, confirm ownership, and enter the applicant and designated-operator contacts.
Choose Type 1 or Type 2, then complete the occupancy, bedroom, parking, and safety fields.
Acknowledge the hotel-occupancy-tax requirement and upload the plans and authorizations required for the application.
Review the application, complete the certification, submit it, and pay the current City fee shown in BuildSA.
Official San Antonio application information and portal.
A receipt, draft, correction notice, or pending status is not approval; resolve it with San Antonio authority before accepting a stay.
Match the issued number, address, unit, operator, and expiration to every San Antonio listing. Correct a missing number or property mismatch before the listing is made bookable.
Monthly City and county reporting is required; platform remittance does not necessarily remove the filing obligation. Renew before the three-year permit expires and keep HOT reporting current.
A San Antonio STR Permit application filing belongs only in San Antonio authority's program and the eligible property class for San Antonio Short Term Rental Permit. If the address, zoning/use result, or approval category differs, correct that decision before resubmitting.
Reconcile the applicant name, street and unit, ownership or tenancy record, tax account, and portal profile used for San Antonio Short Term Rental Permit. Fix the source record that is wrong instead of uploading another conflicting copy.
The City reviews plans and may enforce life-safety and occupancy requirements. Confirm current coverage requirements before submission and operation.
FAQs
No. Obtain the permit before operating; respond to the City renewal reminder before expiration.
$300 for Type 1 and $450 for Type 2 applications and renewals.
Three years; the permit is not transferable.