Confirm the Property
Verify the address, jurisdiction, property type, eligibility rules, and private restrictions.
Before you list
Prepare the San Diego STRO License: prerequisites, documents, fees, application steps, verification, and post-approval work.
Approval path
Verify the address, jurisdiction, property type, eligibility rules, and private restrictions.
Bring the host, ownership, residence, tax, insurance, and supporting records into one file.
Work through the government sequence, then retain the submitted record and confirmation.
Confirm the issued approval, publish required details, and track taxes, changes, and renewal.
Obtain an active San Diego STRO license in the tier that matches the dwelling and planned use. First block the workflow if the address is outside City limits, the unit is an ADU, or the desired capped tier is not accepting applications.
Organize the San Diego application by tier, then connect the tax, occupancy and contact records to the same dwelling before submission.
Confirm the dwelling is inside City of San Diego limits, is not an ADU, and can enter the tier required by the planned use.
Match hosted or whole-home use, rental-day plan and Mission Beach status to the correct tier; do not apply a primary-residence rule to the wrong tier.
Confirm the exact rental unit is active in the City Rental Unit Business Tax account before the STRO application is submitted.
A non-owner host must provide the applicable City Business Tax Certificate under the current STRO instructions.
Upload the lease or other right-to-occupy record that connects the non-owner host to the licensed dwelling unit.
Use contacts who satisfy the selected tier’s response duties and keep the names and numbers identical across the application and listing.
Complete the process through the official City of San Diego STRO Application.
Match the planned hosted or whole-home activity and Mission Beach status to Tier 1, 2, 3, or 4. Success means the host can document Tier 1, 2, 3 or 4 eligibility for this unit. If the use or Mission Beach status points to a closed or capped tier, do not substitute another tier.
Confirm the rental-unit tax account, business certificate, and right-to-occupy records. Success means the Rental Unit Business Tax account, any required Business Tax Certificate and right-to-occupy record all identify the same dwelling and host.
Use the official application and pay the tier-specific nonrefundable fees. Success means the application is accepted in the selected tier with a retained confirmation. A fee receipt does not authorize operation while the license remains pending.
Publish the license number, follow operating rules, and renew before the two-year term ends. Success means the active number is on every listing and tier-specific utilization or quarterly reporting is scheduled. Correct a contact or unit mismatch before the next booking.
Official San Diego application information and portal.
Use the City STRO record to confirm active status, tier, dwelling and expiration; do not treat an application or payment receipt as a license.
Match the City-issued STRO number and approved dwelling unit across every platform listing.
Calendar the two-year renewal, TOT filing, Rental Unit Business Tax work, and Tier 3 or 4 quarterly/utilization duties when applicable.
An ADU, address outside the City, incorrect Mission Beach classification or unavailable capped tier blocks the requested license path.
Conflicting host, owner, unit or tax-account details trigger review; reconcile them before resubmitting.
A missing Rental Unit Business Tax account, Business Tax Certificate or right-to-occupy record can stop an otherwise complete tier application.
FAQs
A valid license is required before operating; Tier 4 Mission Beach applications are currently closed.
Application and license fees vary by Tier 1 through Tier 4 and are published on the STRO page.
STRO licenses expire two years from issuance. Renew the STRO license before the two-year expiration and keep prerequisite tax accounts active.